It has been highlighted a number of non-compliances in connection with the fire break and void protection of the ceiling voids, Throughout Several of our depots.
The project will be to review the existing fire prevention measures currently in place within the ceiling voids noting any associated fire stopping, fire breaks or fire prevention currently in place. Culminating in producing a scope of works for fire protection of the roof void, including fire breaks, fire stopping to any existing walls and a full and considered review of the void protection in line with the current fire alarm system
For more information about this opportunity, please visit the eSourcing portal at:
To respond to this opportunity, please click here:
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Feb 2027 – Aug 2027 | £450,000 | active |