Network Rail have electrified the Great Western route with two major programmes; Crossrail West and Great Western Electrification Programme. These two programmes of work have both constructed new substation assets with associated equipment that the routes need to maintain.
Services include:
•Maintenance and faulting of the distribution equipment.
•Maintenance and faulting of the IPC and SCADA systems.
•Staff training and mentorship support.
•24/7 telephone technical support.
•Rapid fault response.
In the event of a larger incident (such as ATF failures and fires), the Contractor shall make safe only to allow restoration of full passenger service. Any further rectification works required shall be covered by a separate contract order form under the framework. For this type of work, Network Rail reserves the right to approach the open market and conduct a competitive procurement process outside the Framework.
Tender notice (UK4). Open for bids. The submission deadline and how to submit are on this notice.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 2 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Western Apr 2027 – Mar 2029 | £6,750,000 | active |
| Lot 2 Wales Apr 2027 – Mar 2029 | £6,750,000 | active |
Weightings from the notice, applied to every lot.