Yorwaste requires the supply, installation, commissioning and support of one (1), mobile trommel screening solution suitable for processing compost and related materials at Seamer Carr WTS.
The proposed plant must be able to screen processed green waste which has completed a 10-week open windrow process as part of our PAS100 accreditation. Material will be derived from green waste from domestic sources and from landscaping, which could include larger items such as tree branches and small trunks.
Unit quoted must be supplied with tracks and a min. drum size of 6x2.5m. Hybrid options to be considered.
Supplier should offer up to 3 years warranty and PPM/RM Services.
All machinery must carry relevant UKCA marking or CE marking.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Oct 2026 – Sept 2027 | £250,000 | active |