Swansea University is seeking to appoint a suitably qualified contractor to deliver works associated with the Energy Centre upgrade and new District Heat Network (DHN) connection to Union House, forming part of Swansea University’s wider decarbonisation programme at Singleton Campus. The project comprises a significant upgrade to campus heat generation and distribution infrastructure, centred on the installation of approximately 3MW of modular air source heat pump (ASHP) capacity
The project has been developed to RIBA Stage 3 with a fully coordinated design prepared to inform tendering and delivery. The works will be procured via a two-stage tender process, allowing for early contractor engagement during Stage 1 to support design development, buildability, programme optimisation and cost certainty ahead of entering a Stage 2 construction contract.
Tender notice (UK4). Open for bids. The submission deadline and how to submit are on this notice.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Nov 2026 – Nov 2028 | £5,000,000 | active |