The project comprises of removal and replacement of the existing boilers within the existing boiler room.
The works include the following:
Removal of existing boiler plant and sections of existing associated pipework
Powerflush, clean and flush existing heating system
Installation of new natural gas fired condensing boiler
Installation of new header, shunt pump and associated pipework and fittings
Modification of existing flue and installation of new to suit new boiler (via specialist contractor).
Modification of existing boiler room heating circuits and installation of new to suit new boiler arrangement
Modification of existing and installation of gas safety solenoid valve and associated controls
Modification of existing controls to accept outside air sensor (for boiler direct weather compensation feature), and shunt pump.
Associated electrical work including power supply for shunt pump, gas safety panel and condensate pump
Flushing, filling and venting
Commissioning
Dosing of heating system with inhibitor (and provide certification) etc.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| SIMER ENVIRONMENTAL SERVICES LIMITED | 01297168 | £40,816 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £40,816 initial term | active |