WYFRS requires the replacement of the workshop, garage and transport floor. The existing resin floor may need to be removed, or preparatory works may be required prior to the commencement of the project. The scope of works may also include the disposal of the existing floor.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Aspect Building Solutions Ltd | 06382267 | £38,496 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Nov 2026 – Jan 2027 | £90,000 | 3 | active |