Redesign the accommodation into a Supported Housing Pathway to try to maximise the existing level of provision and changing the way we commission the support to allow individual support packages to be more flexible and to reflect the required Ofsted standards.
Pipeline notice (UK1). An early signal of a contract the buyer expects to let. Nothing to bid for yet.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Apr 2027 – Mar 2030 | - | planned |