The Solar Battery Storage Pilot will develop requirements, procure and deliver 6 to 8 containerised battery pods on school sites to manage and aggregate energy from PV and Smart Tariffs. The supplier will also undertake market testing to validate supply chain capacity, cost realism and the technical feasibility of the battery pods.
During the project, the supplier will record lessons learned and iterate the initial specification provided by the Department. Once the installation and monitoring of the pilot sites have concluded, the supplier will produce a final specification in keeping with the Department’s Specification 2025 (abbreviated as Spec25) and develop comprehensive implementation guidance for schools. The supplier will report case studies throughout the project and prepare these for publication. Finally, the supplier will develop a national feasibility assessment with a proposed implementation plan.
The Department is considering a call-off from Construction Professional Services 2 (RM6356) or an Open Procedure tender. If we proceed with RM6356, the specific lot will be determined as the project develops.
Pipeline notice (UK1). An early signal of a contract the buyer expects to let. Nothing to bid for yet.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Oct 2026 – Mar 2028 | - | planned |