This is the replacement of the Non Section 12 BCV Direct Expansion (DX) Split cooling. This will be 700 units on Bakerloo and Victoria Lines. These systems in the Non-public equipment (Secure) rooms prevent operationally critical assets from overheating and failing (e.g., signalling, power, communications systems), potentially disrupting Railway Operations and in Non-public staff rooms they provide a safe working environment in compliance with Health & Safety at Work Regulations helping to reduce financial maintenance pressure long term and adhere to climate change legislation
Pipeline notice (UK1). An early signal of a contract the buyer expects to let. Nothing to bid for yet.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Jan 2029 – Jan 2034 | - | planned |