BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Remove the existing boiler plant and replace with a new natural gas fired condensing boiler installation.
Remove existing flue systems and install new flue systems to serve the new gas fired equipment. Connect the new gas fired equipment to the existing heating circuits, MCW, Gas Supply pipework, and electrical power. Redundant boilers, gas and electrical components, pipework and cable will be removed from site.
Allow for all associated asbestos removal work as identified within the asbestos R&D survey report. Allow to all BWIC make good including holes/surfaces/paintwork/fire stopping left by the works.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| D.S.R. MECHANICAL SERVICES LIMITED | 04641636 | £79,661 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £79,661 initial term | active |