BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Please respond by 18.30 1st May 2026
Request for Information (RFI)
National Grid Electricity Transmission (NGET) is developing a Digital Twin for Electrical Power systems to support transmission network design, analysis, planning, operations, and asset lifecycle management.
A critical enabler of this vision is a Network Master Model Manager: a controlled, authoritative environment used to create, govern, validate, and distribute trusted network model data (including associated metadata) across multiple engineering and operational tools.
Through the RFI, National Grid is seeking information on how your solution supports:
Robust model governance and lifecycle management
Standards based interoperability (e.g. CIM / CGMES)
Strong data quality controls and auditability
Secure deployment and operation at national infrastructure scale
Integration with existing planning, operations, and data platforms
Documentation outlining a request for information (RFI) will be provided to interested suppliers. Please contact …@nationalgrid.com if you would like to receive the RFI documents and if you wish to submit a response.
This RFI does not constitute a formal competitive tendering process.
Should National Grid have a desire towards supplier selection and contract award, suppliers may be invited to the possible stages of pre-qualification and Request for Proposal.
Further stages are optional for National Grid.
National Grid is at the heart of a rapidly evolving energy system.
Our business units play a vital role in connecting millions of people to the energy they depend on, while continuously seeking ways to make the system cleaner and more sustainable. National Grid Ventures and National Grid Partners drive innovation to help revolutionise and decarbonise the future of energy.
To achieve our vision of being at the heart of a clean, fair and affordable energy future in a focused way we have a strategy that sets the bounds of our business. Guiding our efforts within this are five strategic priorities.
Enable the energy transition for all
Build the networks of the future now
Deliver for our customers
Operate safely and efficiently
Build tomorrow's workforce today
For more information, please visit: https://www.nationalgrid.com
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Sept 2026 – Sept 2029 | - | planning |
Changes the buyer published to this notice after it first appeared.
The changes were made because an NDA is not required and suppliers may compete in potential PQQ and RFP stages irrespective of response to this notice or not.
The right to run further stages is optional for National Grid.