BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
London Underground (LU) is proposing to undertake an Early Market Engagement (EME) that will facilitate the development of a suitable procurement strategy for the acquisition of a fleet of Tube Gauge Tampers which are essential for maintaining track geometry across LU's deep tube network, where tight curvature, restricted clearances and 4th rail traction supply impose unique operational constraints.
LU currently operate a set of 3 Tube Gauge Tampers acquired in 1980, which are now beyond their design life, with limited OEM support and increasing obsolescence. To maintain safe track alignment, avoid Temporary Speed Restrictions (TSRs), and ensure long-term operational resilience, LU is exploring options for the replacement of the Tube Gauge Tampers.
This Preliminary Market engagement aims to understand supplier appetite and technical capabilities, innovation and commercial considerations relating to the manufacture, supply, and long-term support of a new set of Tube Gauge Tampers. Feedback will help shape LU's procurement strategy, technical specification, delivery mode, and programme.
The scope of this preliminary market engagement covers the potential procurement of new set of Tube Gauge Tampers capable of operating across the LU network, including deep tube tunnels, depots and subsurface interfaces. The indicative scope include:
Functional and operational requirements:
Environmental Performance
In line with LU's carbon reduction drive, consideration should be placed on Tube Gauge Tampers that are:
Signalling System Integration
The current operational philosophy assumes that the tampers will be loco hauled in Running Mode which reduces the number of signalling systems required to be fitted to the tamper. At this stage the suppliers should consider spatial and technical constraints for integrating a Tripcock signalling system which interfaces with the braking system.
Operational & Functional Requirements
The new tampers should:
Maintenance, Support and Lifecycle Considerations
Suppliers are invited to provide:
Commercial, Programme and Market Information
TfL seeks indicative (non- binding) information on:
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Mar 2028 – Aug 2035 | - | planning |