BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The purpose of this specification and associated drawings is to describe the provision of the replacement of the existing boiler plant and associated ancillary plant within the leisure centre plantroom area.
The building originally had two 1200kW Hoval boilers and a 230kW Binder biomass boiler, however, the biomass boiler has not been operational for several years and the two Hoval boilers have failed beyond repair. Currently there is an external temporary boiler plant supporting the system.
Sefton Borough Council are seeking to replace the gas fired boilers in order that the temporary arrangement can be removed.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| CONSORTIA INTEGRATED SERVICES LTD | 06934089 | £281,285 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £281,285 initial term | active |