BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The procurement scope includes designing, building, operating, and maintaining specialised technologies for capturing, processing, analysing, storing, and transmitting Overhead Line equipment data, and translating it into immediately actionable information. Separate from the core fleet requirements, OLE monitoring has been identified as an area where it is most effective to gather data from in-service passenger trains, with successful trials having been undertaken. The primary benefit of this approach is the frequency of data collection, which can provide alerts for emerging defects, allowing a quick response to prevent de-wirements and the associated significant train service disruption. The term of the framework shall be 4 years (with a break clause at 3rd anniversary or thereafter) with no extensions. Contract term is four years with a break option after year three; forecast value is £22.452m. Performance will be managed through a focused SLA/KPI set.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Aug 2026 – Aug 2030 | - | planned |