BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Moray Council Building Services wishes to put in place a Framework for a period of three years with a possible extension of 12 months, with suitably qualified and experienced Contractors. The Framework will provide professional trade services to assist with Reactive Repairs, Planned Maintenance and Labour Only and will be used to cover the entire Moray region to support the Authority’s owned housing stock of 6,492 properties. A limit of 20 contractors per lot will apply.
No supplier information available.
This procurement was divided into 29 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Asbestos Surveying and Removal (HSE licenced) 1,440 days (≈3.9 yrs) | - | active |
| Lot 2 Blacksmith 1,440 days (≈3.9 yrs) | - | active |
| Lot 3 Builder/Mason 1,440 days (≈3.9 yrs) | - | active |
| Lot 4 Cleaning 1,440 days (≈3.9 yrs) | - | active |
| Lot 5 Drainage & Water Services 1,440 days (≈3.9 yrs) | - | active |
| Lot 6 Electrical 1,440 days (≈3.9 yrs) | - | active |
| Lot 7 Renewables 1,440 days (≈3.9 yrs) | - | active |
| Lot 8 Fire Alarms/Equipment 1,440 days (≈3.9 yrs) | - | active |
| Lot 9 Groundworks 1,440 days (≈3.9 yrs) | - | active |
| Lot 10 Joiner 1,440 days (≈3.9 yrs) | - | active |
| Lot 11 Mechanical and Electrical Services 1,440 days (≈3.9 yrs) | - | active |
| Lot 12 Heating 1,440 days (≈3.9 yrs) | - | active |
| Lot 13 Painting & Decorating 1,440 days (≈3.9 yrs) | - | active |
| Lot 14 Pest Control 1,440 days (≈3.9 yrs) | - | active |
| Lot 15 Plastering 1,440 days (≈3.9 yrs) | - | active |
| Lot 16 Plumbing 1,440 days (≈3.9 yrs) | - | active |
| Lot 17 Removal & Storage 1,440 days (≈3.9 yrs) | - | active |
| Lot 18 Roofing 1,440 days (≈3.9 yrs) | - | active |
| Lot 19 Fittings and Fixures 1,440 days (≈3.9 yrs) | - | active |
| Lot 20 Damp, mould and preservation treatment 1,440 days (≈3.9 yrs) | - | active |
| Lot 21 External Wall Finishes 1,440 days (≈3.9 yrs) | - | active |
| Lot 22 Scaffolding 1,440 days (≈3.9 yrs) | - | active |
| Lot 23 Signage 1,440 days (≈3.9 yrs) | - | active |
| Lot 24 Specialist Trades 1,440 days (≈3.9 yrs) | - | active |
| Lot 25 Workshop Machinery 1,440 days (≈3.9 yrs) | - | active |
| Lot 26 Windows and Doors 1,440 days (≈3.9 yrs) | - | active |
| Lot 27 Multi-Trade 1,440 days (≈3.9 yrs) | - | active |
| Lot 28 Labour Only 1,440 days (≈3.9 yrs) | - | active |
| Lot 29 Gull Control 1,440 days (≈3.9 yrs) | - | active |
Weightings from the notice, applied to every lot.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.