BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The Royal Welsh College of Music and Drama (RWCMD) has appointed a construction partner to carry out refurbishment works in the Raymond Edwards building, including reconfiguration of 2nd floor office spaces to create a large classroom and two agile working offices, and refurbishment of the 1st floor toilet block.
Works on the 2nd floor to include demolition of existing internal walls, blocking up of redundant doorways, installation of new ceiling grid and lighting, dado trunking with power and data, replacement flooring, decoration, installation of in-room air-conditioning, and supply and installation of kitchenette and furniture.
Works within the 1st floor toilet block to include replacement of all sanitaryware, replacement flooring and decoration.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| CARDO (WALES & WEST) LIMITED | 07966669 | £105,697 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 Aug 2026 – Aug 2026 | £100,000 £105,697 initial term | CARDO (WALES & WEST) LIMITED | active |
Weightings from the notice.
Changes the buyer published to this notice after it first appeared.
Estimated value of procurement has been decreased.