The Council is undertaking the refurbishment and extension of Doon Academy including the Leisure Centre under a Design and Build Contract.
The project aims to extend and modernise the existing facility while demolishing ageing and problematic areas of the school (namely the existing 2-storey block) which contain asbestos and aren’t economic to refurbish.
The anticipated construction value is 29m GBP (net construction costs).
The Contract Period is anticipated to be 148 calendar weeks; however, this will be confirmed at ITT stage.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 1,020 days (≈2.8 yrs) | - | active |
Weightings from the notice.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.