OPENTender notice (UK4) · Lowestoft Town CouncilRef ocds-h6vhtk-0661f1
Pump Track
Save Track Track buyer
Contract Value
£200,000
excluding VAT · £200,000 including VAT · Below the relevant threshold
The submission deadline passed on 6 Apr 2026, 9:00am.
Description
Project Aim
To design and construct a durable, community-focused pump track suitable for a wide range of users and abilities.
Scope of Works
The appointed contractor will be responsible for the full design and installation of the pump track, including but not limited to:
Site assessment and feasibility considerations.
Concept design and detailed technical design.
Ground preparation, earthworks, drainage, and surfacing.
Supply of all materials, plant, and labour.
Project management and programme coordination.
Health and safety compliance (including CDM regulations where applicable).
Construction and installation works.
Quality assurance, testing, and certification.
Site reinstatement and finishing works.
Handover documentation including maintenance guidance.
Contractors must ensure designs reflect best practice in pump track construction, durability, safety, accessibility, and long-term maintenance efficiency.
Recommended Design
Contractors are encouraged to include a recommended design they believe best meets the project objectives and represents optimal value.
Design Submission Content
Design proposals should include:
Concept visuals, layouts, and drawings.
Description of features and riding flow.
Intended user groups and skill progression.
Accessibility and inclusive design considerations.
Materials and surfacing specification (e.g. asphalt, concrete, modular systems).
Drainage approach.
Safety design considerations and risk mitigation.
Maintenance requirements and lifecycle expectations.
Pricing Requirements
Submissions must include:
Full cost breakdown for design and installation for each price point.
Identification of optional extras and exclusions.
Design fees clearly separated where applicable.
Estimated maintenance costs (if available).
Confirmation that prices remain valid for a minimum of 12 months from submission date to allow for funding decisions.