Bedfordshire Hospitals NHS Foundation Trust requires the replacement of failed chillers serving Pathology (Building 48/64) and Theatres 3 & 4 (Building 39). The project has been expanded to include increased cooling capacity and the formation of a fully interconnected chilled water network to enhance resilience for critical clinical services.
All works must be undertaken within a live acute hospital environment without disruption to critical cooling services.
The project will be delivered within a live acute hospital environment, requiring careful planning, phased installation, and close coordination with clinical services. The system will be procured as a specialist contractor-designed solution, based on a performance specification, with full responsibility for detailed design, installation, testing, commissioning, and handover.
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-Luton:-Cooling-and-ventilation-equipment./XX7BP6P3R5
To respond to this opportunity, please click here:
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Apr 2026 – Aug 2026 | £700,000 | active |
Weightings from the notice.