BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Scope
Defra is seeking to commission a research project to quantify how a transition to more sustainable and healthy diets, driven by current consumption trends and potentially enhanced by future demand side policies may influence UK territorial greenhouse gas (GHG) emissions from the food system in the run up to Net Zero 2050.
The study should explore a suite of policy driven and trend driven dietary transition scenarios and assess consequential effects on:
The project is expected to address these issues through robust modelling, integrating economic, system-dynamic, behavioural, and physical modelling where appropriate, and using both attributional and consequential Life Cycle Assessment (LCA) approaches.
Required Expertise
Suppliers (or consortia) should demonstrate:
o Systems dynamics models o Agent-based models o Integrated assessment or economic models o Other complex modelling frameworks appropriate for long term scenario design
Consortia and collaborations with academia, research institutes, NGOs, sectoral bodies, and industry partners are welcomed.
Additional Context
This project is informed by a growing evidence base demonstrating that demand side dietary change is likely to be essential for meeting the UK's Net Zero goals, as supply side agricultural efficiencies alone are insufficient. However:
This project intends to fill these gaps by developing a credible, future facing modelling framework capable of capturing complex interactions across the food system and assessing the role of different policy packages.
Defra has separately commission ADAS to examine the climate implications of market expansion in the UK alternative protein sector (outputs expected May 2026). Alignment between this study and the AP study is encouraged.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Apr 2026 – Mar 2027 | - | planning |