Full overlay resurfacing of the existing athletics running track, including preparation of the current surface and installation of a new track system, associated track drainage works, including improvements and modifications required to ensure effective surface water run-off. Upgrade of the existing lighting infrastructure to modern, energy-efficient LED floodlighting, including removal of redundant lighting, installation of new LED.
The works are intended improve energy efficiency and extend the operational lifespan of the facility.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Apr 2026 – Jun 2026 | £583,333 | active |