BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The Second Midlands Electric Vehicle Infrastructure Consortium (SMeviC) in collaboration with Midlands Connect invite tenders to deliver this project.
SMeviC have been allocated LEVI Capital Funding for the procurement of end-to-end EVI solutions across its geographic region. This open procurement has been separated into two Lots, each with their own concession contract:
Lot 1 - standard and/or fast chargepoints sockets, with minimum socket output of 7kW, up to 22kW.
Lot 2 - rapid (50 kW+ DC) chargepoint sockets.
This invitation is to appoint a single Concessionaire (or Partnership of Concessionaires) per Lot to support the delivery of this project for the works of:
Chargepoint site assessments and design, Supply, delivery, installation, and commissioning, Grid connection and supply, Maintenance and repair (underground and overground assets), Ongoing operation, including customer service/support and the supply of a Chargepoint management system.
No supplier information available.
This procurement was divided into 2 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 standard and/or fast chargepoints sockets, with minimum socket output of 7kW, up to 22kW Nov 2026 – Nov 2041 | - | active |
| Lot 2 Rapid (50 kW+ DC) chargepoint sockets Nov 2026 – Nov 2041 | - | active |
Weightings from the notice, applied to every lot.
Changes the buyer published to this notice after it first appeared.
link to the procurement portal added