Framework to upgrade existing buildings in Surrey for residents, particularly those who are vulnerable to high energy costs and poor health outcomes, and who currently live in substandard housing. These works from the Framework will look to improve energy efficiency, reduce carbon emissions, and lower utility costs.
Completing high quality- installations that provide bill and carbon savings aligned with and equipping properties to be more resilient to climate change and benefit from the Net Zero transition
No supplier information available.
This procurement was divided into 12 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 East Surrey Retrofit Professional Services (Retrofit Assessment, Coordination & Project Management) Sept 2026 – Sept 2030 | £150,000 | active |
| Lot 1b West Surrey Retrofit Professional Services (Retrofit Assessment, Coordination & Project Management) Sept 2026 – Sept 2030 | £150,000 | active |
| Lot 2a East Surrey Renewables and Energy Storage (Solar PV, Solar Thermal, Battery Storage) Sept 2026 – Sept 2030 | £6,000,000 | active |
| Lot 2b West Surrey Renewables and Energy Storage (Solar PV, Solar Thermal, Battery Storage) Sept 2026 – Sept 2030 | £6,000,000 | active |
| Lot 3a East Surrey Insulation, Ventilation, Windows, and Doors (Loft, Cavity Wall, Underfloor, External Wall, Internal Wall, Park Homes) Sept 2026 – Sept 2030 | £850,000 | active |
| Lot 3b West Surrey Insulation, Ventilation, Windows, and Doors (Loft, Cavity Wall, Underfloor, External Wall, Internal Wall, Park Homes) Sept 2026 – Sept 2030 | £850,000 | active |
| Lot 4a East Surrey Low Carbon Heating (Heat Pumps, Electric Storage heaters, biomass boilers) Sept 2026 – Sept 2030 | £450,000 | active |
| Lot 4b West Surrey Low Carbon Heating (Heat Pumps, Electric Storage heaters, biomass boilers) Sept 2026 – Sept 2030 | £450,000 | active |
| Lot 5a East Surrey Property Flood Resilience Assessment Sept 2026 – Sept 2030 | £56,250 | active |
| Lot 5b West Surrey Property Flood Resilience Assessment Sept 2026 – Sept 2030 | £56,250 | active |
| Lot 6a East Surrey Property Flood Resilience Installation Sept 2026 – Sept 2030 | £506,250 | active |
| Lot 6b West Surrey Property Flood Resilience Installation Sept 2026 – Sept 2030 | £506,250 | active |
Weightings from the notice, applied to every lot.