Hengistbury Head Long Groyne on the headland between Poole and Christchurch Bays has been reconstructed in 2024, consisting of granite rock armour. The structure replaced the original life expired groyne constructed in 1939, with a newer standard of design to provide coastal erosion protection for a further 100+yrs.
As part of the scheme a marine 'Environmental Enhancement' was installed to increase the biodiversity of the area. This transformed an area of sandy foreshore to a more diverse environment using limestone reclaimed from the deconstructed groyne and an array of marine concrete ecological enhancement units.
This contract is to provide structured intertidal and subtidal monitoring of the enhancement over a number of years, aimed at monitoring the ecological status, growth and biodiversity of the marine 'Environmental Enhancement' installation completed as part of the coastal defence works on and around Hengistbury Head Long Groyne.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| MARINE FARM SERVICES LIMITED | 13056424 | £145,000 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately. 8 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Apr 2026 – Mar 2029 | £150,000 £145,000 initial term | 8 | active |
Weightings from the notice.
Changes the buyer published to this notice after it first appeared.
Incorrect Procurement Reference Number stated within the 'Summary' of the original notice. The reference is DN803008.