The UAE Network requires a contractor to remove existing air-conditioning units and install new DX-type, wall-mounted, CE-marked non-inverter units at two sites: Abu Dhabi (14 units of 1.5 Ton and 20 units of 1 Ton) and Dubai – British Embassy Compound (21 units of 2 Ton and 9 units of 1.5 Ton). The scope includes installation with copper piping, conduits, drain lines, and mounting supports, followed by leak testing, system vacuuming, refrigerant top-up (R410A), and full testing and commissioning.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Golden Tower Technologies | - | £28,450 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £28,450 initial term | Golden Tower Technologies | active |