HSE require a 3" vent stack for use with cryogenic hydrogen for an experimental programme. The vent must have interchangeable terminations (miter cut, bullhorn) which may be on a flanged connection or otherwise joined.
The vent stack (including the termination) should have a height of 7 m and the vent stack must have a maximum allowable working pressure of 40 barg.
Nominal process conditions:
Hydrogen, 50 - 70 K, 0 - 1.5 kg/s, 0 -12 barg
The equipment is required for use at the HSE Buxton (SK17 9JN) test site.
HSE is seeking to understand the design of potential solutions and the associated costs of manufacturing this equipment.
Suppliers should email …@hse.gov.uk with any questions and costs associated with supplying the above.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Mar 2026 – Sept 2026 | £25,000 | planned |