Enabling works - Upgrade of electrical intake to the site
(for the purpose of installation of Air Source Heat Pumps (ASHP) at Fullwell Cross
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| UK Power Network (Operations) Limited | - | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £26,841 initial term | UK Power Network (Operations) Limited | active |