HSE require the supply of hydrogen gas for use during a research test programme. The gas is intended to be used by piping into an existing pressure reduction system which will meter the gas through to a flow management system.
Two deliveries are required between 2027 - 2028, each delivery may be up to 800 kg of hydrogen.
The gas supply is required for use at the HSE Buxton (SK17 9JN) test site.
HSE is seeking to understand the potential cost and implications of this supply.
Suppliers should email …@hse.gov.uk with any questions and costs associated with supplying the above.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Mar 2026 – Jun 2028 | - | planned |