Supply and install a helium recovery system to capture cryogenic helium boil‑off (≥98% purity), buffer, compress to high pressure (up to 350 bar) and charge into BOC MCP storage packs, including purity metering, flow metering, approximately 10,000‑litre helium recovery gas bag, HP filtration, control/charging panel, bag‑level‑controlled compressor start/stop, installation, testing and commissioning, and provision of Written Scheme of Examination (PSSR 2000).
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| March Engineering | - | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £131,150 initial term | March Engineering | active |