Lot 1
18 month maintenance contract for 95 chargers utilising local electrical contractors (within each Council area)
Lot 2
Supply of 12x 7kW replacement chargers, 21x 22kW replacement chargers and 2x50kW additional chargers for two new sites
Install the supplied chargers plus 5 we have in stock (1x50kW, 2x22kW and 2x7kW) utilising local contractors (within the Council area)
No supplier information available.
This procurement was divided into 2 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 2 Supply and Install 540 days (≈1.5 yrs) | - | active |
| Lot 1 Local maintenance 540 days (≈1.5 yrs) | - | active |