Description
Quayside Civils (These works are the focus of this PQQ)
Setting up principal contractor welfare area including all temporary service connections,
Breaking out and disposal of concrete guide walls following installation by quay wall contractor,
Removal of piling mat, installed by Others,
Cropping of diaphragm wall to cut off level.
Reinforced concrete capping beams, to both quay and anchor wall, with a design life of 100 years to tie in with the Phase 1 quay, Including the supply and installation of all quay furniture cast in elements.
Removal of existing sheet pile quay wall, anchor wall and tie rods.
Excavation to tie rod level, approximately +0.0mCD, including dewatering system to facilitate,
Installation of tie rods (free-issue) between quay and anchor walls,
Backfilling above tie rods to formation level using site-won material,
100m wide quay apron along the entire length of the new quay including capping layer and unbound stone pavement,
250kPa uniform loading capacity,
Finished level of +6.5mCD (varies depending on drainage falls),
Installation of temporary and permanents sheet piles,
Infiltration drainage system with trenches as required,
Quay furniture including flexible mooring and berthing equipment such as pneumatic fenders, removeable bollards, and safety equipment inclusive of all associated cast in items,
Instrumentation and monitoring equipment associated with the quay wall.
Upgrades to the existing quayside which extends east beyond the new Phase 2 300m diaphragm wall and apron by approximately 758m, whilst retaining the existing quay wall, to extend the usable quayside (dredged by others).
There will be a requirement for the Contractor to coordinate elements of works with the Clients quay wall and landside civils principal contractors.
There is potential for the works to be varied to extend the new quay wall and quay wall civils further than the initial 300m.
This procurement was divided into 1 lots, each awarded separately.
Lots
1
Lot
Value
Status
Lot 1
390 days (≈1.1 yrs)
-
active
Key Dates
Published
13 January 2026
Tender Open
-
Tender Deadline
16 January 2026
Award Date
-
Contract Start
-
Contract End
-
Extension option
Potential to be extended in relation to scope changes and/or in relation to future phases of work.
Notice Amendments
Changes the buyer published to this notice after it first appeared.
Amendment 1
Time limit (IV.2.2): 16 January 2026 → 23 January 2026
Estimated date of dispatch of invitations (IV.2.3): 6 February 2026 → 16 February 2026
Allowing suppliers a one-week extension to support adequate resourcing and review of PQQ submissions following the Christmas and New Year holiday period, ensuring fair and equal opportunity for all bidders
Procurement Details
Method
Selective — suppliers are shortlisted first
Method Details
Competitive procedure with negotiation
Route to market
Restricted or negotiated
Main category
Works
Category
–
Delivery location
UKM62
Open under
WTO Government Procurement Agreement
Buyer Reference
APP2-HAV-ZZ-QUA-PQ-K-000001
Legal Basis
Public Contracts Regulations 2015 (EU Directive 2014/24)