Removal of the temporary boiler and strip out and replace the existing heating system within the boiler room including the boilers, stainless steel flue, pressurisation unit, expansion vessel, dosing pots, pump sets, valve sets, controls, ancillaries, and pipework (up to a connection point within the boiler room). The new heating system will connect into the existing distribution LTHW pipework before leaving the boiler room.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Rubon Mechanical Services Ltd | 13111570 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £144,267 initial term | Rubon Mechanical Services Ltd | active |