Supply (including design, assembly, supply, delivery and co-commissioning) of an integral modular primary and secondary treatment system(s) to be implemented as sidestream solutions at multiple sewage treatment works (STWs) across AMP8.
Severn Trent Water requires integral solutions - primary settlement, biozone/ biological treatment and humus/ final settlement - all to be contained within a singular modular 'roll on roll off' unit - with lifting points for cranage where required.
Potential for a limited number of alternative configuration units may be required depending on site requirements - e.g.) biozone only, biozone + humus settlement zone, primary settlement + biozone.
The units required are to be deployed at small to medium size treatment works. With the aim being to install an independent side stream to increase the treatment capacity. Allowing for an increase of Flow to Full Treatment (FFT). The flow will be proportionally distributed between the existing assets and modular sidestreams based upon the maximum treatment flow.
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Feb 2026 – Mar 2030 | - | planning |