BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Yorkshire Water (YW) and Kelda are engaging the market with the intention of detailed wind studies at an initial 7 sites with the deployment of LiDAR for 6-12 months surveys, depending on initial 6 month wind data. Pending programme development, YW / Kelda may seek to expand to an estimated 25 sites for development.
The purpose of this Wind LiDAR Survey is to obtain accurate, high-resolution wind data for the analysis of wind characteristics at various heights above ground level. The survey will provide essential data to support Energy Yield Assessments (EYA), site feasibility studies, and wind resource modelling for a minimum of 6 months. Data will be required to be remotely monitored and optionally processed, with final analysis carried out using industry recognised software and aligned to best practice standards.
The works will be undertaken in accordance with international wind measurement and assessment standards. The outputs must be suitable for raising finance
Yorkshire Water & Kelda Group would like to have discussions with suitably qualified parties to discuss the availability of these services.
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Jan 2026 – Jan 2027 | - | planning |