The supply and installation of 10 mm plywood to ceilings along with 4" x 2" brackets to a cloud design, is required for all offices on the Gr. Floor
The installation of covers, strips and two coats of paint is also necessary.
Finally, 200 mm holes must be cut to accommodate the luminaires, which are to be supplied by a third party.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Mosaic Property Management Ltd | 13932523 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £67,750 initial term | Mosaic Property Management Ltd | active |