BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The Manufacturer shall provide all materials necessary to fabricate complete deliverables. The
Manufacturer shall provide manufacturing engineering services required to generate internal shop drawings and all documentation needed to manage and support their suppliers. The Manufacturer shall provide all labour to assemble, test, and supervise the manufacture of all components regardless of where these are made within the manufacturer’s plant or in a second facility or sub-contractor. The Manufacturer shall fabricate jigs and fixtures to ensure ports, brackets, and other important components are maintained to specified tolerances. Any information of a proprietary nature must be identified in the bid response.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Wuxi Creative Technologies ltd | Procurement ID: PYBQ-3577-DQNG | £273,566 | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Jan 2026 – Jan 2028 | £350,000 | 3 | Wuxi Creative Technologies ltd | pending |
Weightings from the notice.