BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement notice is to seek information from the market to help refine our understanding and aid the development of a future specification.
UKIFS is seeking experts to support the design and development of a CO2 condenser that is part of the STEP power cycle. This is because a high-performance CO2 condenser is critical to the efficiency of the STEP powerplant (supercritical and/or transcritical CO2 power generation cycles are currently the preferred concept for the STEP prototypic plant). The proposed technical and operating conditions of the proposed CO2 condenser are:
•Operating pressure is between ca. 60-100 bar for the CO2 stream
•Operating inlet temperature will be between ca. 50 - 110°C. The outlet temperature will be between ca. 20-25 °C for the CO2 stream.
•Thermal duty is in the range of 1-2 GWth.
•The equipment must comply with UK pressure equipment regulations.
Note: both wet and dry cooling options are of interest, as are both existing and novel technologies or design approaches.
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://ukifs.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-design-services./2HE569TDE9
To respond to this opportunity, please click here:
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Apr 2026 – Mar 2027 | - | planning |