BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
A single storey mezzanine to be designed and installed to provide additional storage and to link up two existing mezzanines to create access between the two. There is currently a staircase down from one of the existing mezzanine’s that we would like to remove subject to building control as this is in the space between the two. The mezzanine is to have finishes matching the current one. Loading requirements to be 750kgm2 or higher.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 0 Dec 2025 – Apr 2026 | - | planning |