BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Sixteen homes at the Cherrybrook Close scheme in Hope-Under-Dinmore, Herefordshire, have suffered significant flooding in recent years.
There is a brook that runs through the middle of the scheme behind the houses that front onto the main road.
The scheme is located at the end of a long road through Hope-Under-Dinmore within the local authority of Herefordshire Council. The homes are in an area where water has historically gravitated towards when there has been sustained and heavy rainfall before the water makes its way into the brook. The water travels from the south from higher ground and has impacted internally the 16 homes that are closest to the main road; these being 1-6, 9-10 and 31-38 Cherrybrook Close.
The properties to the rear of the scheme are on higher ground and so have not flooded internally up to this point.
The most recent floods in November 2024 prompted a full review of the flood strategy for this scheme and more in-depth discussions with Herefordshire Council about the wider impact of flooding on the area due to factors outside of Stonewater’s control/ownership/responsibility.
Stonewater have been reviewing localised flood defence options and have settled on a product that provides protection to each home that has flooded internally in the past. The specifications are as follows:
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=984654694
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Nov 2025 – Dec 2025 | - | planning |