BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
1. Joint Nature Conservation Committee
The Joint Nature Conservation Committee (JNCC) is the statutory adviser to the UK Government and devolved administrations on UK and international nature conservation
Our role is to provide scientific evidence, information, and advice to inform decisions to protect the natural environment. Our specific role is to work on nature conservation issues that affect the UK as a whole and internationally, by:
Background to JNCC can be found on JNCC's website at: https://jncc.gov.uk/about-jncc/
2. Project Aims
3. Project Background
The Large Plant Combustion Directive (LPCD), introduced by the European Union, aimed to reduce air pollution from large combustion plants by setting limits on emissions of sulphur dioxide (SO₂), nitrogen oxides (NOₓ), and particulate matter. As part of compliance, UK power stations were required to monitor ecological impacts at nearby Natura 2000 sites. UKCEH conducted a four-year monitoring programme (2011-2015) across seven sites, including Skipwith Common in North Yorkshire, which was notably affected by emissions from three nearby coal-fired power stations: Drax, Eggborough, and Ferrybridge. See figure1.
Skipwith Common National Nature Reserve (NNR) spans 270 hectares was selected for its representative heathland vegetation, minimal land management, and proximity to existing monitoring infrastructure. The original study involved air quality measurements, vegetation surveys, and soil analyses. With the closure of the three power stations and reduced pollution levels suggested by regional data, this contract seeks to revisit the site to assess signs of ecological recovery. This includes evaluating changes in air quality, vegetation composition, and soil chemistry, building on the baseline data collected over a decade ago.
Figure 1: Location of Skipwith Common (red point) and the three former coal-powered power stations (yellow points)
This contract forms part of the Air Pollution Recovery Indicators programme of work.
4. Project Objectives
To meet the overall aims of this project (Section 2), the objectives are:
To assess whether Skipwith Common SAC shows signs of ecological recovery from air pollution following the closure of nearby coal-fired power stations, by replicating and enhancing previous air quality, vegetation, and soil monitoring surveys.
5. Project Objectives: Detailed Tasks
Contractors are welcome to suggest their own sample placements, numbers and analysis. The below is just a suggestion based on previous work.
I. This could include monitoring of concentrations of NH₃, SO₂, and NOₓ (at least 10 locations)
II. Utilise existing monitoring and data where possible e.g. wet deposition.
III. Re-survey the original 50 quadrats (2x2 m) within the 1-hectare area using the same methodology as in 2011 and 2014 and record species presence and abundance to detect changes since 2014.
IV. Estimate of soil chemistry across the site e.g. pH, nutrients and base cations
V. Set up monthly soil solution sampling at 2 depths e.g. 15cm and 30cm and analyse for acid anions, base cations, pH, DOC, ammonium, phosphate, and conductivity.
6. Potential Follow-On Work
Bidders should be aware that there is the potential for the successful bidder to be requested by JNCC to undertake additional work on this contract into the financial year 2026/27. This could be for follow on work at other Energy Supply Industry sites (ESI's) subject to funding post March 2026.
Please note however that the potential for additional work to be undertaken is subject to a continuing need, availability of funds and satisfactory contractor performance. For the avoidance of doubt, no guarantee can be given that you will be asked to undertake the potential additional work outlined within this SoW document. Bidders are not asked to provide detailed project plans for these follow-on aspects at this stage.
7. Outputs
8. Product Specification
JNCC is committed to making its publicly available resources and documents accessible, in accordance with the Public Sector Bodies (Websites and Mobile Applications) (No. 2) Accessibility Regulations 2018.
Making material accessible means making sure it can be used by as many people as possible. This includes those with:
impaired vision
motor difficulties
cognitive impairments or learning disabilities
deafness or impaired hearing
The outputs and material that JNCC publishes should be compliant with the Web Content Accessibility Guidelines version 2.1 AA standard.
To meet this standard, all reports and other documentation which are to be made publicly available must adhere to JNCC's house-style (to be provided) and be produced using a JNCC template (to be provided), unless otherwise stated. (Project managers to note - there are two templates, please decide which is most appropriate, either the 'standard' template rather than the JNCC report template). All reports (draft and final) should be provided electronically via email both as a Microsoft Word document and an Adobe PDF.
Copies of documentation associated with case studies should be provided in electronic format with an associated reference catalogue.
For any other outputs or products which are to be made publicly available through JNCC, evidence regarding how the accessibility standard will be reached should be included.
(Note for author if research project/contract: see EQA Policy Appendix 4 (Communicating Evidence Quality). Ensure that data management and storage requirements are stipulated taking into account relevant policy for data access. See https://jncc.gov.uk/about-jncc/corporate-information/evidence-quality-assurance/
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Nov 2025 – Mar 2026 | £116,666 | active |
Weightings from the notice.
Changes the buyer published to this notice after it first appeared.
The value of this project is now £140,000 (incl.VAT) due to the availability of budget.
A Clarification of questions & answers log has been uploaded for your use.
V3 bidder's questions and answers log added to the document section of this advert. (C25-0891-2111 Questions and Answers Log_22102025_V3)