BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Design and supply of Fibre Reinforced Polymer (FRP) Bridges - Roadbridges suitable for 44Tonnes Highways Loading plus supply and design of footbridges, cycleways, bridleways and bridge decking solutions suitable for highways loading (up to 44 Tonnes).
The manufacturing process should use the resin infusion technique with a mould. This allows arrangement of fibres at different orientations to ensure maximum performance and if required fibre and resin types can be altered to suit a particular application. Foam core should also be used between the top mat and bottom mat for structural efficiency.
Ideally constructed using a proven monolithic FRP system (e.g. InfraCore or equivalent) with vacuum infusion method. This type of construction has a low maintenance requirement and subsequently features a long design life.
Elements of the bridge structures will have an expected design life of:
Also be able to design such bridges and provide outline proposals and detailed costings. Most structures we require will need bespoke designs.
Typical projects expected to range between £50k–£250k per bridge, depending on size and specification
Be able to manufacture and supply a bridge within a short timeframe up to 3 months.
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Nov 2025 – Oct 2029 | - | planning |