This invitation to tender covers 4 lots (contracts) to increase the resilience of seagrass meadows around the Isle of Eigg, Small Isles, Scotland through the planning, purchase and installation of Advance Mooring Systems (AMS). These contracts include the procurement of capital equipment. All procurement will be undertaken by the Marine Conservation Society in alignment with their procurement policy.
Priority locations have been identified by the community and seagrass surveys carried out in summer/autumn 2025. The contractor is expected to build upon this work, as well as take into consideration work undertaken by other initiatives and projects such as the ReMEDIES project on the south coast of England and any previous work carried out on the Isle of Eigg.
Building on previous work and with the help of the Scottish Seascapes Project Manager and the Isle of Eigg Heritage Trusts Scottish Seascapes Project Officer the contractor/s will deliver the following:
a) WP1: Front end engineering & design b) WP2: Design & manufacture c) WP3: Installation d) WP4: Inspections & maintenance
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Blue Parameters Limited | - | £91,367 | 4 lots Eco-mooring front end engineering & design · Eco-mooring installation · Eco-mooring inspections & maintenance · Eco-mooring design & manufacture | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 4 lots, each awarded separately. 12 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 2 Eco-mooring design & manufacture 60 days | £48,000 initial term | 3 | Blue Parameters Limited | active |
| Lot 3 Eco-mooring installation 60 days | £28,280 initial term | 3 | Blue Parameters Limited | active |
| Lot 4 Eco-mooring inspections & maintenance 60 days | £6,000 initial term | 3 | Blue Parameters Limited | active |
| Lot 1 Eco-mooring front end engineering & design 60 days | £9,087 initial term | 3 | Blue Parameters Limited | active |
Weightings from the notice, applied to every lot.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.