Technical specialist case studies are required at to look into the financial model the costs of running the air source heat pump (ASHP) against the previous running costs of the gas boilers and also show where efficiencies can be made in terms of further decarbonisation measures at local schools.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| HILLSIDE-INFINITAS LIMITED | 14319841 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £79,520 initial term | HILLSIDE-INFINITAS LIMITED | active |