The range of stepping arrangements at the Platform Train Interface (PTI) on the GB network presents issues for safe and independent boarding across the GB rail network. Variations in platform height, train floor level, door opening treadplates and platform curvature create vertical and lateral stepping distances that present accessibility as well as safety and operational challenges, particularly for passengers with reduced mobility or other access needs. These challenges also affect dwell times, operational performance, and passenger confidence.
While previous research has provided valuable insights into PTI geometry, human factors, and accessibility implications, the industry still lacks a useable classification system that links physical PTI geometry measures to accessibility levels. An evidence-based framework is needed to guide cost-effective interventions and prioritise investment in boarding accessibility.
To address this gap, RSSB together with NR System Operator is scoping two complementary research projects. We are seeking supplier input into the scoping activity underway. Please provide your views on the questions specified within the documentation:
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-London:-Research-services./7V297ESNT8
To respond to this opportunity, please click here:
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Nov 2025 – Sept 2026 | - | planning |