BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Maintenance of generator control systems equipment including an exact mock-up of the control systems so that install upgrades and new parts can be tested these before added to our live system here on site. The site mock-up is an invaluable tool and ensures they do not risk any Plowright/EC1 energised power system or cause problems when it comes to the replacement/change or upgrade of control equipment. This is a Bespoke installation with some challenging parameters such as dual HV supplies, dual LV supplies to each building wing and Twin generators ensuring power is always available to this world-renowned research building where the power MUST always remain on.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Total Energy Controls Limited | 04623780 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | £29,697 initial term | Total Energy Controls Limited | active |