TfGM has established a contract to ascertain current asset condition information & outline design (Phase 1).
At present there are a number of assets (exact extents unknown) which are located within the OCLZ within 1CC that were not electrically bonded when the system was “floated” in 2017. All existing 1CC line-side assets, that fall within the OCLZ, must be assessed against relevant standards and the Metrolink Infrastructure Technical Specification System Earthing Policy to ensure compliance and any identified non-compliances rectified on site.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Siemens Mobility Limited | 00016033 | - | 1 lot Lot 1 | LOBBYIST Crestview Strategy Ltd (3 quarters) MHP Communications (2 quarters) Headland Consultancy Limited (1 quarter) |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | £527,457 initial term | 3 | Siemens Mobility Limited | active |
Weightings from the notice.
Government spending data: This supplier has received £37,134,343 in 196 payments (over £25k) from Department for Transport, Department for Education, BEIS, UKRI, Dorset Police and 1 more public bodies (2019-04-24 to 2026-05-18). View full payment history →