The Authority is conducting Pre-Market Engagement on Forward Area Sensor -Passive for Land GBAD.
Land-GBAD (Ground Based Air Defence):
The Land GBAD Programme was established in response to Army requirement for a fully integrated Air Defence system of systems. This will be an enduring capability that will be delivered through incremental capability uplifts over the next 10 years. The Single Statement of User Need (SSUN) for Land GBAD is:
Land-GBAD must provide sufficient, effective capability to warn, inform, deter and defeat selected air threats (including aircraft, missiles, munitions, and UAS), in order to prevent adversary interference from the air inhibiting Joint Force freedom of manoeuvre. Land-GBAD will provide lethal and non-lethal defeat mechanisms and minimise the risk it presents to friendly and neutral air users. It will be deployable on multi-domain operations, integrated, scalable up to divisional level, and in joint and multi-national operations to Protect, Engage, Constrain and Fight.
Capabilities to be delivered and enhanced by the Land GBAD programme include:
The capabilities which make up the Land GBAD System of Systems (SOS) will be incrementally procured and delivered through a number of related contracts over a 10-year period, these will require a high level of integration and SOS testing. Land GBAD will also consider novel weapons, where they are appropriately effective and sufficiently mature.
Forward Area Sensor - Passive
It has been identified through multiple studies and modelling scenarios that there is a requirement for a Passive Sensor within the Land GBAD network, specifically in the SHORAD area.
The intention is that this passive sensor serves to provide early warning of threats, permitting the active sensor to remain inoperative until a threat is detected, as per NATO doctrine.
The following general conditions should be noted:
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Jun 2026 – Jun 2029 | - | planning |