BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Key worker properties require works including but not limited to:
Installation of kitchen wall, base and corner units
Installation of descaler
Installation of sink and taps
Installation of new lighting
Installation of extractor fan
Installation of new flooring
Installation of appliances (where applicable)
Installation of hardwired heat detector (hard wired linked to smoke detector) (where applicable)
Electrical rewire (where applicable)
Redecoration of walls, ceilings, timber, all previously decorated surfaces
Undertaking any passive fire stopping works required
Installation of tiling/wall boarding (where applicable)
To view this notice, please click here:
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968514990
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| CBM Group Limited | 08513931 | £1,114,823 | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 5 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 | - | 5 | CBM Group Limited | active |