The installation of new photovoltaic (PV) panels at the Luton depot. The objective of this initiative is to reduce the site’s reliance on grid-supplied electricity by generating renewable energy on site. The appointed contractor will be responsible for all stages of the project, including site validation, system design, supply, delivery, installation, and commissioning. Their role is to deliver a fully functional and efficient PV system that meets the required standards.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Oct 2025 – Feb 2026 | - | planning |