BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The purpose of this study is to assess the technical and practical viability of EV charging infrastructure across the pre-identified sites, considering space requirements, grid capacity and necessary infrastructure, planning constraints, wider operational needs and forecast demand patterns within the individual sites. In doing so, the outcome will be a robust strategic evidence base with a set of recommendations to inform future investment decisions, ensuring that infrastructure development is aligned with local transport strategies and net zero goals.
This work builds on current EV project and local authority climate and EV strategies. These projects include the delivery of LEVI and ZEBRA funding to accelerate uptake of zero-emission vehicles (ZEVs). These existing initiatives have supported the installation of public charging points and fleet electrification, such as the ZEBRA-funded Warrington Own Buses which are now operational.
ECW are therefore looking to appoint consultants to collaborate with Local Authority partners to support further EV development across the subregion. Consultants will be expected to draw on existing data and conduct additional research to recommend an appropriate mix of chargers that meets both current and anticipated needs across the identified sites.
o Recommendations for the most suitable commercial model for delivery and methodology used - this would include an assessment into a fully-funded Charge Point Operator (CPO) with a net revenue share commission for the local authority with a comparison to a local authority owned and financed model with a partnership with the CPO as the operator.
o Evaluation of the commercial model options to understand the criteria which will make sites most commercially appealing at this scale, including key data such as rental per charging bay per year, pence per kWh revenue share, a mix per bay rental and a revenue share above a certain threshold etc.
o A summary of technical delivery considerations, including using tools developed by TfN and DNOs. This could include a consideration of the economics of phasing of installations or battery installation to counter grid constraints that are present.
o Estimated CO2e emissions savings from provision of this installation
The consultant will also need to provide a summary report, drawing on findings at all three sites presenting the wider investment case across the three locations.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Aug 2025 – Nov 2025 | £20,000 | active |
Weightings from the notice.
Changes the buyer published to this notice after it first appeared.
Uploaded the queries and responses from potential bidders
Uploaded the final version of the questions and responses to potential bidders